產(chǎn)品別名 |
水處理設(shè)備,工業(yè)廢水設(shè)備,工業(yè)污水設(shè)備 |
面向地區(qū) |
品牌 |
天通 |
|
規(guī)格 |
其它 |
加工定制 |
是 |
人類生產(chǎn)活動(dòng)造成的水體污染中,工業(yè)引起的水體污染嚴(yán)重。如工業(yè)廢水,它含污染物多,成分復(fù)雜,不僅在水中不易凈化,而且處理也比較困難。
工業(yè)廢水,是工業(yè)污染引起水體污染的重要的原因。它占工業(yè)排出的污染物的大部分。工業(yè)廢水所含的污染物因工廠種類不同而千差萬別,即使是同類工廠,生產(chǎn)過程不同,其所含污染物的質(zhì)和量也不一樣。工業(yè)除了排出的廢水直接注入水體引起污染外,固體廢物和廢氣也會(huì)污染水體。
我公司主要產(chǎn)品:水處理設(shè)備,污水處理設(shè)備、廢水處理設(shè)備、工業(yè)污水設(shè)備、農(nóng)業(yè)廢水設(shè)備、雨水凈水設(shè)備、醫(yī)院污水設(shè)備、鋼廠廢水設(shè)備、屠宰場(chǎng)廢水設(shè)備、食品廠廢水處理設(shè)備等多種設(shè)備,可根據(jù)要求定制水處理設(shè)備。
濟(jì)寧天通設(shè)備有限公司是一家從事水處理設(shè)備生產(chǎn)、銷售集一體化的企業(yè),始終堅(jiān)持做出產(chǎn)品,本著“追求、員工、技術(shù)、精神、利益”10字宗旨?,F(xiàn)擁有一批精干的管理人員和一支高素質(zhì)的技術(shù)隊(duì)伍,舒適優(yōu)雅的辦公環(huán)境和擁有全新現(xiàn)代化的標(biāo)準(zhǔn)廠房。我們以質(zhì)量為生命、時(shí)間為信譽(yù)、價(jià)格為競(jìng)爭(zhēng)力的經(jīng)營(yíng)信念,立足與濟(jì)寧地區(qū)
貴陽(yáng)某造紙廢水處理工程
工程名稱:貴陽(yáng)地區(qū)造紙廢水處理工程
工程性質(zhì):造紙廢水處理工程
工程范圍:污水處理站1米內(nèi)的所有內(nèi)容,包括設(shè)備的供貨、指導(dǎo)調(diào)試。
二 排放標(biāo)準(zhǔn):
該設(shè)備處理后水質(zhì)標(biāo)準(zhǔn)如下表所示《污水綜合排放標(biāo)準(zhǔn)》GB8978-2002排放標(biāo)準(zhǔn)執(zhí)行:
項(xiàng)目 | CODCR/(mg/L) | BOD5/(mg/L) | SS/(mg/L) |
進(jìn)水量 出水量 | 1500-2000 ≤60
| 500-1000 ≤10
| 200-450 ≤10
|
三要求:
(1) 處理工藝技術(shù),系統(tǒng)運(yùn)行經(jīng)濟(jì)安全可靠。
(2) 處理設(shè)施、節(jié)能,管理、運(yùn)行、維修方便且能長(zhǎng)久正常運(yùn)行。
(3) 構(gòu)筑物及設(shè)備布局要緊湊合理,占地面積小且美觀大方。
(4) 乙方:所供設(shè)備和配套材料都是全新的、完整的和新設(shè)計(jì)的,達(dá)到質(zhì)量標(biāo)準(zhǔn)和滿足安全使用要求
五 質(zhì)量
1 賣方所提供設(shè)備是全新的、在交付時(shí)沒有材質(zhì)或工藝上的缺陷且符合買方提出的技術(shù)標(biāo)準(zhǔn)及規(guī)范;
2 賣方應(yīng)其出售的設(shè)備科提供正常和恰當(dāng)?shù)厥褂茫⑶以诮?jīng)過正確安裝、正常操作和保養(yǎng)的前提下,在設(shè)備的壽命期內(nèi)運(yùn)轉(zhuǎn)良好;
3 設(shè)備的材料和零部件均應(yīng)符合或優(yōu)于買方提出的技術(shù)標(biāo)準(zhǔn)及規(guī)范。
六 設(shè)備的安裝調(diào)試驗(yàn)收
1 設(shè)備交貨后,賣方應(yīng)在買方通知現(xiàn)場(chǎng)具備安裝條件時(shí),在一周或更短的時(shí)間內(nèi)派技術(shù)人員到場(chǎng)安裝,并在規(guī)定時(shí)間內(nèi)安裝調(diào)試完畢,同時(shí)賣方負(fù)責(zé)安裝調(diào)試過程中所有因質(zhì)量缺陷而損壞的零部件免費(fèi)更換。
2 設(shè)備在賣方指導(dǎo)下安裝調(diào)試運(yùn)行后,買方和賣方共同對(duì)設(shè)備進(jìn)行安裝調(diào)試驗(yàn)收,若賣方不參與聯(lián)合檢驗(yàn),則視為同意買方的驗(yàn)收結(jié)果。設(shè)備經(jīng)安裝調(diào)試驗(yàn)收合格后,由雙方共同簽署《設(shè)備安裝調(diào)試驗(yàn)收結(jié)論單》。
3由賣方負(fù)責(zé)指導(dǎo)安裝,并負(fù)責(zé)指導(dǎo)調(diào)試,只有經(jīng)過安裝調(diào)試并且技術(shù)性能達(dá)到合同技術(shù)中所述的技術(shù)要求后,買方才能接受全部貨物。
In the water pollution caused by human production activities, the water pollution caused by industry is the most serious. Such as industrial wastewater, it contains more pollutants and complex components, not only in water is not easy to purify, but also difficult to deal with.
Industrial waste water is the most important cause of water pollution caused by industrial pollution. It accounts for most of the pollutants discharged from industry. Industrial wastewater contains varied pollutants due to different plant types. Even in similar factories, the quality and quantity of pollutants contained are different from those of similar factories. In addition to the direct injection of waste water from the wastewater to cause pollution, solid waste and waste gas will also pollute the water body.
Our main products: water treatment equipment, sewage treatment equipment, sewage treatment equipment, industrial equipment, agricultural sewage water equipment, water purification equipment, water equipment, steel hospital sewage water equipment, slaughterhouse wastewater equipment, food factory wastewater treatment equipment and other equipment, can be customized according to the requirements of professional water treatment equipment.
Jining Tiantong Equipment Co., Ltd. is a company engaged in the integration and production of water treatment equipment. It always insists on making high-quality products, in line with the 10 purposes of "pursuit, employees, technology, spirit and interests". We have a group of competent managers and a high-quality professional and technical team, comfortable and elegant office environment and a new and modern standard factory. We are based on the quality of life, time as a credit, price competitive business belief, based on the Jining region
.
A paper waste water treatment project in Guiyang
Project Name: papermaking wastewater treatment project in Guiyang area
Engineering properties: Papermaking Wastewater Treatment Engineering
The scope of the project: the sewage treatment station within 1 meters of all content, including delivery, equipment debugging.
Two emission standards:
The water quality standard of the equipment is implemented as follows: the first level discharge standard of the "sewage comprehensive discharge standard" GB8978-2002, as shown in the following table:
project
CODCR/ (mg/L)
BOD5/ (mg/L)
SS/ (mg/L)
Influent amount
Water output
1500-2000
Less than or equal to 60
500-1000
Less than or equal to 10
200-450
Less than or equal to 10
Three the requirements:
(1) the processing technology is advanced and the system is safe and reliable.
(2) the treatment facilities are efficient and energy-saving, and the management, operation and maintenance are convenient and can run for a long time.
(3) the layout of the structures and equipment should be compact and reasonable, and the area is small and beautiful.
(4) Party B guarantees that the equipment and supporting materials are all new, complete and latest designed to meet the quality standards and meet the safety requirements.
Five quality assurance
1 the Seller guarantees that the equipment provided is completely new and has no material or technological defects at the time of delivery and is in conformity with the technical standards and specifications proposed by the buyer.
2, the Seller shall ensure that the equipment department which sells it provides normal and proper use, and performs well during the life of the equipment under the premise of proper installation, normal operation and maintenance.
3 the materials and parts of the equipment shall be in conformity with or superior to the technical standards and specifications proposed by the buyer.
Installation and acceptance check and acceptance of six equipment
1 equipment after delivery, the Seller shall notify the buyer in the field have the installation conditions, sent technical personnel to the scene to install in a week or a shorter period of time, and the installation is completed within the specified time, at the same time, the Seller shall be responsible for the installation process all the damage due to quality defects of parts replaced free of charge.
2, when the equipment is installed under the seller's guidance and commissioning, the buyer and seller jointly install, check and accept the equipment. If the seller does not participate in the joint inspection, it will be deemed to agree with the buyer's acceptance result. After the installation and commissioning of the equipment, the two parties jointly sign the "conclusion of the installation and commissioning of equipment".
3, the seller is responsible for guiding the installation, and is responsible for guiding the commissioning. Only after installation and commissioning and technical performance can meet the technical requirements described in the contract technology, can the buyer accept all the goods.